Waterwatch Data Portal
ME_YGR020 Blackburn Lake at the Landing, a constructed platform on the edge of the lake
3 February 2013
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at the Landing, a constructed platform on the edge of the lake ME_YGR020 |
Date and Time | Sunday 3rd February 2013 10:20am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 80 | 7 | 2 | 7.7 | 0 | 20 | 20 | 22 |
Weather | |
---|---|
Last rainfall | During the last 24 hours 20 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | |
Stream depth | 1m - 2m |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au