Site visit details

Overview

Catchment Goulburn River
Site Dry Creek at McKenzies Bridge, Hamilton Street, Broadford GB_DRY025
Date and Time Saturday 18th April 2015 16:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units Rain mm rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 370 11.5 16.8 0.18 50
Weather sunny
Last rainfall During the last 24 hours 11.5
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Scummy,Milky
Stream depth
Stream width
Hazards
Litter/Pollutants
Water with added runoff from road bringing fresh water, scum and clay.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au