Waterwatch Data Portal
ME_YGR020 Blackburn Lake at the Landing, a constructed platform on the edge of the lake
4 January 2015
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Blackburn Lake at the Landing, a constructed platform on the edge of the lake ME_YGR020 |
Date and Time | Sunday 4th January 2015 10:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 85 | 7 | 140 | 7.1 | 0 | 20 | 23 | 27 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 4 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au