Waterwatch Data Portal
CO_SWA110 Lake Victoria outlet @ Bellarine Hwy
11 March 2015
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Lake Victoria outlet @ Bellarine Hwy CO_SWA110 |
Date and Time | Wednesday 11th March 2015 10:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 70 | 6.4 | 79000 | 8.3 | 0.02 | 19 | 18.5 | 0 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear,Scummy,Other: scum on sides and top |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
in
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au