Site visit details

Overview

Catchment Broken River
Site Bobs Creek near Barwite GB_BOB005
Date and Time Tuesday 10th February 2015 17:30pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C P mg/L Turb NTU
Sample 850 7.7 0 29.3 2.3
Weather
Last rainfall
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
No January sample round done. Flow is only a minute trickle.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au