Site visit details

Overview

Catchment Campaspe River
Site Myrtle Creek at the Bendigo-Sutton Grange Road bridge NC_MYR250
Date and Time Friday 26th June 2015 14:30pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1380 7 0 14.5 11.7 10
Weather sunny
Last rainfall During the last week 2
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants
Unitil now I have not been able to do testing as there has been no water in the creek since September 2014

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au