Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
1 August 2015
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 1st August 2015 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 8 | 270 | 7.2 | 0.02 | 12.3 | 10.3 | 19 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | 1.0 |
Stream width | 10.0 |
Hazards | |
Litter/Pollutants | other |
Other litter included car tyre, orange road safety mesh & green plastic webbing. The sample water was shaken for our turbidity test & warmed for both the phosphate & ammonium tests.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au