Site visit details

Overview

Catchment Yarra River
Site Grace Burn at the Wallace Parade bridge, Healesville ME_YGC100
Date and Time Friday 14th August 2015 14:00pm
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 89 10 40 6.2 0.01 14.8 10 10
Weather overcast
Last rainfall During the last 24 hours
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants
pH meter possibly not reading correctly?

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au