Waterwatch Data Portal
ME_EBA800 Balcombe Creek at the footbridge as it exits The Briar's Park, Mt Martha
23 June 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at the footbridge as it exits The Briar's Park, Mt Martha ME_EBA800 |
Date and Time | Sunday 23rd June 2013 09:40am |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Stained brown |
Stream depth | 0 - 50cm |
Stream width | |
Hazards | |
Litter/Pollutants |
Changes: Phosphate level increase, due to increased rainfall run-off. Estuary entrance open, rainfall since last reading 140.8mm
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au