Site visit details

Overview

Catchment Goulburn River
Site Sugarloaf Creek at Pyalong-Tallarook Rd GB_SUG018
Date and Time Monday 24th August 2015 09:40am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 75 8.6 108 1370 7.5 0 9 9.7 1553 8.4
Weather cloudy
Last rainfall
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Low to medium flow, leaning to low. Cattle still have access to site as electric fence is not up. Filamentous algae in stream. pH meter did not calibrate to buffer 4. E.coli sample taken as creek is flowing.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au