Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at outfall to Port Phillip Bay, Mt Martha ME_ESU450
Date and Time Monday 14th September 2015 10:55am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 77 8 3200 8.2 0.01 19 13 7
Weather sunny
Last rainfall During the last week 15
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 0.5
Hazards Steep slope beside road
Litter/Pollutants bottles,cans,packets,paper,plastic,polystyrene
1 bag of rubbish removed from the rocks on the foreshore near mouth of the creek.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au