Waterwatch Data Portal
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Reedy Billabong East ME_YYR808 |
Date and Time | Friday 18th September 2015 10:50am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.55 | 2.7 | 560 | 7.1 | 0.37 | 13.5 | 12.5 | 15 | 9 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 1 |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | Clear |
Stream depth | 1m - 2m |
Stream width | 50 |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au