Site visit details

Overview

Catchment Maribyrnong River
Site Tributary of Deep Creek @ Newham Primary School ME_MDT010
Date and Time Wednesday 21st October 2015 09:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 58.3895 6 930 6.1 0.1 18 14 9
Weather overcast
Last rainfall During the last 24 hours 5
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants

problems with calibration of pH meter. pH strips were closer to 7 than 6.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au