Site visit details

Overview

Catchment Latrobe River
Site Heart Morass site @ Levee bank (East side) WG_HRT516
Date and Time Monday 9th November 2015 18:05pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm GB Height m pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 70 900 6.67 27 23.4 124
Weather sunny
Last rainfall During the last week 10.2
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Muddy
Stream depth
Stream width
Hazards
Litter/Pollutants
Yeokal meter used (was calibrated).

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au