Site visit details

Overview

Catchment Yarra River
Site Chelsworth Input (stormwater capture draining to Reedy Billabong) ME_YYD808
Date and Time Friday 20th November 2015 09:45am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.27 7.2 1620 0.18 19 17.5 9.5
Weather cloudy
Last rainfall More than a week ago
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 1
Hazards
Litter/Pollutants
Colorimeter pH = 7.8

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au