Waterwatch Data Portal
GB_DRY025 Dry Creek at McKenzies Bridge, Hamilton Street, Broadford
24 November 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Dry Creek at McKenzies Bridge, Hamilton Street, Broadford GB_DRY025 |
Date and Time | Tuesday 24th November 2015 10:15am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 630 | 0 | 15.3 | 0.11 | 42 |
Weather | sunny |
---|---|
Last rainfall | During the last week 2.2 |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Stained brown |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Local runoff after rain - lower EC than DRY020, brown stain
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au