Waterwatch Data Portal
ME_YGC100 Grace Burn at the Wallace Parade bridge, Healesville
20 November 2015
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Grace Burn at the Wallace Parade bridge, Healesville ME_YGC100 |
Date and Time | Friday 20th November 2015 09:45am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 102 | 10 | 50 | 6.8 | 0.01 | 20.1 | 16.5 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au