Waterwatch Data Portal
EG_FOR040 Forge Creek, corner bend - Site 2
20 November 2015
Site visit details
Overview
Catchment | Lake Victoria |
---|---|
Site | Forge Creek, corner bend - Site 2 EG_FOR040 |
Date and Time | Friday 20th November 2015 09:45am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 152 | 6.43 | 0 | 22.5 | 19.3 | 9 |
Weather | sunny |
---|---|
Last rainfall | During the last week 2.8 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Stained brown,Other: Algal growth |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au