Waterwatch Data Portal
CO_SWA110 Lake Victoria outlet @ Bellarine Hwy
30 December 2015
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Lake Victoria outlet @ Bellarine Hwy CO_SWA110 |
Date and Time | Wednesday 30th December 2015 09:38am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 34 | 3 | 77500 | 8.2 | 0.01 | 23.4 | 19.5 | 1 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Scummy,Other: almost dry |
Stream depth | 0.1 |
Stream width | < 0.3 |
Hazards | |
Litter/Pollutants | plastic |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au