Waterwatch Data Portal
GB_WGS002 Mid point of bioremediation basin - Gemmills Swamp
27 July 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Mid point of bioremediation basin - Gemmills Swamp GB_WGS002 |
Date and Time | Monday 27th July 2015 12:55pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 46 | 5.3 | 77 | 6.9 | 0.05 | 8 | 7 |
Weather | overcast |
---|---|
Last rainfall | 0 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
overcast, cold, windy day wattles flowering lots of magpies frogs calling in wetland
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au