Site visit details

Overview

Catchment Goulburn River
Site Outlet pit of bioremediation basin - Wetland at Gemmills Swamp GB_WGS003
Date and Time Monday 27th July 2015 13:05pm
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 22 49 5.8 56 78 6.7 0.06 7.5 1414 0.07 5
Weather overcast
Last rainfall 0
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
overcast, cold, windy day wattles flowering lots of magpies frogs calling in wetland

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au