Site visit details

Overview

Catchment Goulburn River
Site Mid point of bioremediation basin - Gemmills Swamp GB_WGS002
Date and Time Wednesday 30th September 2015 11:55am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 104 9.9 117 7.1 0.06 18.9 73
Weather sunny
Last rainfall 0
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
warm, clear day lots of plants flowering frogs calling water level low - very muddy

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au