Waterwatch Data Portal
GB_WGS002 Mid point of bioremediation basin - Gemmills Swamp
28 October 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Mid point of bioremediation basin - Gemmills Swamp GB_WGS002 |
Date and Time | Wednesday 28th October 2015 10:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 60 | 5.4 | 176 | 6.6 | 0.92 | 20.4 | 25 |
Weather | sunny |
---|---|
Last rainfall | 0 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
warm sunny day water level low water reduced to a muddy puddle lots of flowers and birds
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au