Site visit details

Overview

Catchment Goulburn River
Site Mid point of bioremediation basin - Gemmills Swamp GB_WGS002
Date and Time Monday 21st December 2015 10:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 55 4.7 198 6.5 0.61 21.8 31
Weather windy
Last rainfall 0
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
warm and windy very hot over the last weekend water level low water tea coloured

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au