Site visit details

Overview

Catchment Goulburn River
Site Lake Bartlett - Goulburn Murray Water Drain GB_LBT001
Date and Time Monday 11th January 2016 11:05am
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 52 59 4.8 1046 270 7.2 0.01 25.1 2420 0.25 433
Weather sunny
Last rainfall 0
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
hot and sunny day weather has been extremely hot water level low muddy

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au