Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at Panorama Drive, Mt Martha ME_ESU200
Date and Time Monday 18th January 2016 09:40am
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample
Weather sunny
Last rainfall During the last week 0.2
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Scummy,Smelly
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards Steep slope next to roadside
Litter/Pollutants
Source of pollutants has been located and fixed (sewer reconnected). Will take time to clean out residue from stormwater drains. Mornington Peninsula Shire working on this.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au