Site visit details

Overview

Catchment Goulburn River
Site Dry Creek at McKenzies Bridge, Hamilton Street, Broadford GB_DRY025
Date and Time Monday 15th February 2016 08:15am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units Rain mm rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 440 0 15.9 0.29 21
Weather sunny
Last rainfall More than a week ago 2
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Muddy,Scummy
Stream depth
Stream width
Hazards
Litter/Pollutants
Water levels in pools have risen with rain more than 2 weeks ago after prolonged dry

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au