Site visit details

Overview

Catchment Goulburn River
Site Sugarloaf Creek at ford in Ashes Bridge Road GB_SUG020
Date and Time Monday 21st March 2016 09:10am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 0
Weather
Last rainfall During the last week 19
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Disconnected pool. No flow through culverts or over sandbar downstream. photos

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au