Waterwatch Data Portal
ME_DBC250 Blind Creek, 100 metres upstream of confluence of Dandenong Creek. In Boral, Scoresby.
29 January 2016
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Blind Creek, 100 metres upstream of confluence of Dandenong Creek. In Boral, Scoresby. ME_DBC250 |
Date and Time | Friday 29th January 2016 10:29am |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | raining |
---|---|
Last rainfall | During the last 24 hours 18 |
Flow estimate | FLOOD / OVERBANK: flow is high and water level has exceeded bank capacity and is connecting with floodplain |
Water Appearance | Muddy |
Stream depth | 1m - 2m |
Stream width | >5m |
Hazards | |
Litter/Pollutants | other |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au