Site visit details

Overview

Catchment Yarra River
Site Chelsworth Overflow (stormwater capture draining to Reedy Billabong) ME_YYD809
Date and Time Friday 18th March 2016 09:50am
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample
Weather raining
Last rainfall Raining Now 10
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 1
Hazards
Litter/Pollutants
Water flowing out of pipe.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au