Site visit details

Overview

Catchment Yarra River
Site Mullum Mullum Creek at Tandarook Crescent, Donvale ME_YML047
Date and Time Wednesday 20th April 2016 10:00am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 670 9.2 0.07 22 15 9
Weather sunny
Last rainfall During the last week 5
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
smell of septics very strong as we were approaching the test site

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au