Site visit details

Overview

Catchment Maribyrnong River
Site Tributary of Deep Creek @ Newham Primary School ME_MDT010
Date and Time Wednesday 27th April 2016 09:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.5 36.3073 4 290 7 0.25 17.5 11 100
Weather overcast
Last rainfall During the last week 11.5
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Muddy
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

The pH was measured with a strip DO was estimated as the syringe was broken Wood ducks and white faced heron on the pond Both phosphate and ammonium were greater than the last number

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au