Waterwatch Data Portal
GB_LEC008 Lima East Creek at Creamery Lane
6 March 2016
Site visit details
Overview
Catchment | Broken River |
---|---|
Site | Lima East Creek at Creamery Lane GB_LEC008 |
Date and Time | Sunday 6th March 2016 11:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 130 | 6.1 | 0 | 20.9 | 10 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago 0 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 0.5 |
Hazards | |
Litter/Pollutants |
This site is tested where the creek flow through the culvert under Creamery Lane
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au