Waterwatch Data Portal
GB_LEC008 Lima East Creek at Creamery Lane
3 April 2016
Site visit details
Overview
Catchment | Broken River |
---|---|
Site | Lima East Creek at Creamery Lane GB_LEC008 |
Date and Time | Sunday 3rd April 2016 14:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 110 | 6.7 | 0 | 20.6 | 10 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago 50 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear,Other: very low flow <5cm depth in culvert |
Stream depth | 0 - 50cm |
Stream width | 0.5 |
Hazards | |
Litter/Pollutants |
Very low flow <5 cm in culvert under road
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au