Waterwatch Data Portal
ME_YYD809 Chelsworth Overflow (stormwater capture draining to Reedy Billabong)
20 May 2016
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Chelsworth Overflow (stormwater capture draining to Reedy Billabong) ME_YYD809 |
Date and Time | Friday 20th May 2016 09:40am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.21 | 4.8 | 860 | 7.1 | 0.22 | 12.5 | 14.5 | 9 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 2 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 1 |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au