Site visit details

Overview

Catchment Bunyip River
Site Warringine Creek downstream of Frankston-Flinders/Watts Rd ME_EWA300
Date and Time Friday 11th July 2014 12:20pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1113 7.5 0.1 12 12 28
Weather sunny
Last rainfall
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants waxed cardboard

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au