Waterwatch Data Portal
ME_EWA300 Warringine Creek downstream of Frankston-Flinders/Watts Rd
22 July 2014
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Warringine Creek downstream of Frankston-Flinders/Watts Rd ME_EWA300 |
Date and Time | Tuesday 22nd July 2014 12:20pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 1167 | 6.8 | 0.25 | 19 | 11 | 30 |
Weather | sunny |
---|---|
Last rainfall | |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
Noted a mistake in the depth. Recorded as 46m, supposed to be 46cm. Lodged as 46cm.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au