Site visit details

Overview

Catchment Bunyip River
Site Warringine Creek at Carpenters Lane North Bridge ME_EWA060
Date and Time Saturday 29th November 2014 09:45am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1290 7.3 0.7 23 14 13
Weather overcast
Last rainfall
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth 0 - 50cm
Stream width 0.5
Hazards
Litter/Pollutants waxed cardboard

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au