Waterwatch Data Portal
CO_SWA110 Lake Victoria outlet @ Bellarine Hwy
11 July 2016
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Lake Victoria outlet @ Bellarine Hwy CO_SWA110 |
Date and Time | Monday 11th July 2016 11:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 64 | 6.9 | 56000 | 8.1 | 0.02 | 14 | 11 | 0 |
Weather | sunny |
---|---|
Last rainfall | During the last week 38 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | paper,polystyrene |
Water flowing into lake
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au