Waterwatch Data Portal
ME_YYD809 Chelsworth Overflow (stormwater capture draining to Reedy Billabong)
15 July 2016
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Chelsworth Overflow (stormwater capture draining to Reedy Billabong) ME_YYD809 |
Date and Time | Friday 15th July 2016 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.12 | 6.6 | 920 | 7.5 | 0.26 | 10 | 11 | 9 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 4 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 1 |
Hazards | |
Litter/Pollutants |
Used double amount of sulphuric acid sol'n
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au