Site visit details

Overview

Catchment Ovens River
Site Barwidgee Creek, DePiazza Lane, Mudgegonga LCG Site 4 NE_BAR045
Date and Time Monday 18th July 2016 09:57am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Water ° C Turb NTU
Sample 88.9 9.23 270 6.9 0.026 8.9 9
Weather overcast
Last rainfall
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants
Hi, After good performance with the DO meter, it was bone dry!!! Refilled and all ok. Who knows??? Cheers, Terry

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au