Waterwatch Data Portal
GB_CRE002 Creightons Creek u/s of Threlful Creek
19 June 2016
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek u/s of Threlful Creek GB_CRE002 |
Date and Time | Sunday 19th June 2016 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 120 | 16 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall : 100mm since 15/5/16. EC lower at all sites. Turbidity about the same as last month for sites upstream, and higher downstream.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au