Waterwatch Data Portal
GB_HUG003 Ruffy "Boat Hole" on Upper Hughes Creek
18 April 2016
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Ruffy "Boat Hole" on Upper Hughes Creek GB_HUG003 |
Date and Time | Monday 18th April 2016 08:47am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 190 | 0 | 11.5 | 15 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Very low flowing. Steady flow. E.coli samples not able to be tested as no chemicals available.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au