Waterwatch Data Portal
GB_BAR010 Baronga Creek at Creightons Creek
15 June 2008
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Baronga Creek at Creightons Creek GB_BAR010 |
Date and Time | Sunday 15th June 2008 12:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 130 | 10 | 15 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
rain 36mm since 18-05-08 mostly in 2nd week June EC Mostly about the same as may except PEA010 which is significantly lower.Turbidity lower than high levels of May? (John wrote June)
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au