Waterwatch Data Portal
GB_BAR010 Baronga Creek at Creightons Creek
16 March 2009
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Baronga Creek at Creightons Creek GB_BAR010 |
Date and Time | Monday 16th March 2009 12:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 170 | 7.2 | 4 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall 34 mm in March 09. EC variable. Turbidity mostly lower than Feb 09, especially at freshly flowing sites
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au