Waterwatch Data Portal
GB_BAR010 Baronga Creek at Creightons Creek
19 September 2010
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Baronga Creek at Creightons Creek GB_BAR010 |
Date and Time | Sunday 19th September 2010 12:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 130 | 6.8 | 15 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall ~100mm in both Aug and Sept between waterwatch sample dates. EC approx same as August, turbidity lower than august downstream to CRE011, then much higher from CRE012 (Fays) through to Longwood CRE022
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au