Waterwatch Data Portal
GB_CRE011 Creightons Creek at Bartons Lane
17 May 2009
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek at Bartons Lane GB_CRE011 |
Date and Time | Sunday 17th May 2009 12:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 210 | 6.9 | 11 | 6 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall ~ 90 mm in last week of April, then 9 mm on 15-5-09 EC mostly higher at Upper and lower sites turbidity higher at upper sites, organic gunk at CRE014, very clear at CRE014 and CRE015 sites that were dry in April
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au