Site visit details

Overview

Catchment Goulburn River
Site Murray River before entry of Goulburn River GB_MUR094
Date and Time Friday 26th February 2010 15:20pm
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N Nitrate mg/L pH pH Units Rain mm Water ° C P mg/L Turb NTU
Sample 98 7.8 52 7.8 25.5 42
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Current flow descriptions for GBCMA: BF (Bankfull) High flow within channel capacity and in-stream habitats connected HF (High flow) Less than bankfull and in-stream habitats connected LF (Low flow) Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) NF1 (No flow 1) No continuous flow in channel and no pools NF2 (No flow 2) No continuous flow in channel and intermittent pools (in-stream habitats not connected) NF3 (No flow 3) No continuous flow in channel and continuous pools (in-stream habitats connected) NNF Near normal flows

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au