Site visit details

Overview

Catchment Goulburn River
Site Steavenson River at Barton's Bridge in Marysville GB_STE005
Date and Time Thursday 11th March 2010 16:20pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 75 7.1 36 6.9 18.4 0.02 20
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Dani Beischer actually sampled Current flow descriptions for GBCMA: BF (Bankfull) High flow within channel capacity and in-stream habitats connected HF (High flow) Less than bankfull and in-stream habitats connected LF (Low flow) Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) NF1 (No flow 1) No continuous flow in channel and no pools NF2 (No flow 2) No continuous flow in channel and intermittent pools (in-stream habitats not connected) NF3 (No flow 3) No continuous flow in channel and continuous pools (in-stream habitats connected) NNF Near normal flows

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au