Waterwatch Data Portal
GB_CRE012 Creightons Creek at Fay's
18 October 2009
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek at Fay's GB_CRE012 |
Date and Time | Sunday 18th October 2009 12:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|
Sample | 150 | 15 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: 58mm in week 21/9, ~60mm (very variable along valley) in week 12/10 Ec lower at all sites. Turbidity higher at all sites.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au